EPCM Firms

Your One-Stop-Shop Piling Partner

With over 30 years in the piling industry, DFI has a wealth of experience working directly with engineering, procurement & construction management firms when it comes to their foundation system needs because we operate very much the same. Driven, helical, sheet. Design, supply, install. Concept to cap, start to finish, we continue to successfully deliver one-stop-shop solutions for large-scale projects to some of Australia’s most trusted names like Monadelphous, Clough, GPA Engineering & Wood.

Not only can we handle your build requirements, our in-house engineering team can also do the design work for you. We understand that having the proper documentation – including inspection test plans (ITPs) with minimal requests for information (RFIs) – prepared in a timely manner, is essential. Once drawings are issued, we get to work right away to complete the project on time and on budget.

They Say Can’t, We Say Watch Us!

Our toolbox is big! We never say “no”; we find a way. If the job seems impossible, contact DFI. We’ve developed a track record as the go-to experts because of our experience, knowledge, and turnkey advantage.

“It’s effortless to work with us.” – Matt Meyer, DFI Australia Director

The earlier we become involved, the more effective we are at saving you time and money by optimizing your project schedule and reducing your material expenses.

Our proprietary purpose-built equipment is designed to operate in all environments including Australia’s rough terrain and harsh climates. Greenfield, brownfield, live facilities, embankments, rivers, infrastructure, etc. – consider it handled.

Why proprietary matters? By building our own equipment and having well-trained, experienced staff, we can fix any on-site problems, should they arise. This helps to ensure your project is completed on time and on budget. Additionally, we take pride in keeping our top-of-the-line fleet in peak working order so we are able to deploy and start jobs on time.

Our Standards: Quality, Health, Safety & Environment (QHSE)

Quality – DFI’s quality management system (QMS) is modelled in compliance with the International Standards Organization’s ISO 9001 standard. From concept to cap, DFI’s QMS ensures that the Standards Australia AS 2159 compliant foundations are adhered to from start to finish.

Health, Safety and Environment (HSE) – DFI’s integrated HSE system is modelled in compliance with the International Standards Organization’s ISO 45001, the new Occupational Health & Safety standard, and the ISO 14001, the Environmental Management standard.

From greenfield to brownfield environments, DFI’s comprehensive HSE policy ensures that we operate under DFI Safe Operating Procedures and Safe Work Method Statements in order to deliver foundation systems safely and efficiently.

Our Qualifications

DFI is proud to be QBCC licensed (license number 15176384). The QBCC is a statutory body that is part of the portfolio of the Minister for Public Works. It was established under the Queensland Building and Construction Commission Act 1991 (QBCC Act) to regulate the building industry.

Play VideoThe DFI Advantage
Watch What Only We Can Do...

Well Done!

Santos

Equipment direct mounted on driven steel piles is a novel foundation system method for the O&G industry in Australia resulting in substantial savings compared to traditional concrete.

Sanjay GoelGLNG DEV PROJECTS FACILITIES LEAD
apa

With the goal of eliminating concrete, DFI has been very responsive providing steel driven piling foundations. They deliver quick, cost effective, safe solutions well suited to our needs.

Alex KristovskisPROJECT DIRECTOR

Pile layout and installation planning was critical in order to avoid complex site manoeuvring. DFI offered smart solutions with their design, materials, equipment and personnel.

Mel WhytePRESIDENT & MANAGING DIRECTOR
Senex

DFI’s steel pile foundation systems provide significant value in terms of time and cost savings. Design simplicity, installation speed and immediate placement of equipment in the field, mean foundations take weeks, not months, like concrete.

Mick CooleySURFACE FACILITIES LEAD
+61 7-3263-4611